TECHNOLOGY AND PRODUCT DEVELOPMENT
Cubrim Roadmap
Faster processing. Less memory. Easier integration.
Our first priority is faster compression and decompression, lower memory use and a lighter Cubrim distribution. The Archiver, Addressor and Web evolve as one product family supported by a continuing research program.
This page describes planned work and acceptance criteria. Completed test results are published separately; planned optimizations are not claims of achieved performance.
Public roadmap in the repositoryThe next engineering cycle
Work within the current engineering team’s capacity can start without waiting for an investment round.
-
Establish the baseline
Record the build, corpora, commands and measurements for compression, restoration, memory and total output size.
-
Find the bottlenecks
Profile CPU, allocations, scheme selection and I/O. Optimize the work that actually determines processing cost.
-
Test the first improvements
Run bounded speed and memory experiments with acceptance limits for output size, resources and duration set in advance.
-
Prepare an integration
Choose a data class, performance profile and requirements for a library or server module.
Eight development tracks
Each delivered result is accompanied by measurements, checks and an accepted code revision.
First priority
Cubrim Archiver
Speed, lower memory use and a lighter distribution.
- Optimize measured hot paths and scheme-selection cost; accelerate decompression independently.
- Bound memory and buffers; evaluate parallelism and platform-specific optimization after profiling.
- Develop fast, balanced and memory-limited profiles while retaining the maximum-compression mode.
- Reduce binary, package and dependency size; prepare a minimal decoder.
- Verify portability on Linux x86-64 and macOS arm64, including Apple Silicon.
Acceptance criterion. Exact restoration and a measured improvement within agreed size, speed and memory limits. Package size and peak RAM are separate metrics.
Pilot use case
Cubrim Addressor
Represent data with shared blocks, addresses and missing fragments.
- Test the Addressor together with Cubrim compression on larger datasets, copies, versions and synchronization.
- Account for initial base delivery, repeated transfers, indexes, metadata and missing blocks.
- Test integrity, lookup, transfer resumption and recovery after connection loss.
Acceptance criterion. Byte-exact restoration and an effect across the complete storage and transfer system, not only the address list.
Streaming and integration
Cubrim Web
Compression for browsers, servers, applications and APIs.
- Accelerate server encoding and client decoding; bound memory and client-module size.
- Support incremental output, buffer control, cancellation and fallback to a supported codec.
- Compare bytes and latency with Brotli and Zstd, including cold dictionary and decoder delivery.
Acceptance criterion. Lower transfer volume without regressing the agreed latency. Start with controlled environments; native support in standard Chrome is a separate stage.
Continuing program
Science and agent-assisted research
Turn new publications and hypotheses into subsequent product versions.
- Study open research, reproduce methods and retain both positive and negative findings.
- Develop the agent council workflow: hypothesis → implementation → measurement → selection → release.
- Separate experimental and product branches; specify compute budgets and stopping criteria.
Acceptance criterion. An accepted improvement has a source, code, measurements and a decision. Research efficiency is measured by outcomes and experiment cost.
Every release
Reliability and compatibility
Data preservation underpins every product track.
- Test exact restoration, format boundaries, damaged inputs and truncated streams.
- Keep previously written data readable; accompany new formats with specifications and migration plans.
- Test decoder limits, upgrades and rollback; enable restoration without a mandatory vendor service.
Acceptance criterion. Version-linked tests, checked compatibility and resource limits, and a defined rollback procedure.
Integration readiness
SDK and enterprise product
A stable library, CLI and server components.
- Define interfaces, errors, versions, cancellation and streaming behavior.
- Provide packages, documentation and examples without requiring the research environment.
- Develop updates, support and repeatable onboarding for service providers and OEM partners.
Acceptance criterion. A reproducible customer deployment with measured integration and support costs.
Alongside engineering
Deployments, licensing and market
From customer-data testing to recurring contracts.
- Select the initial segment and measure total economics: storage, network, CPU/RAM, restoration and integration.
- Develop annual direct licenses, service-provider and OEM channels; measure renewals and expansion.
- Refine TAM, SAM and SOM, program budgets and development rights; agree financing terms separately.
Acceptance criterion. A measured effect, an agreed contract and a reproducible integration process. A market scenario is not actual revenue.
Industry expansion
Scientific and space systems
Protocol and hardware solutions with technology partners.
- Study data from space stations, telescopes and autonomous lunar and Mars explorers.
- Model constrained and intermittent links, contact windows, initial base delivery and autonomous recovery.
- Test methods on representative datasets and target hardware before selecting a hardware implementation.
Acceptance criterion. A dedicated requirements set, testbed and industry partner. Applicability and qualification are established through testing.
Research → product → distribution
The 0–6, 6–12 and 12–24 month periods start with the funded program. They describe development stages, not calendar release dates.
- Next cycle
Baseline and initial optimizations
Freeze the build and tests, profile the code, and evaluate speed and memory candidates.
- 0–6 months
Target performance profile
Performance on selected data, customer trials, rights and licensing.
- 6–12 months
Enterprise product
Stable library or server module, paid deployments, updates and support.
- 12–24 months
Partner distribution
Service providers and OEMs, experiment automation and contract expansion.
- Beyond
New industries and platforms
Industry-specific profiles, Web integrations and separate software–hardware programs.
Public documents and feedback
The public roadmap, measurement methodology and feedback guidelines are published together. Results are distinguished from planned work and accompanied by their scope and evidence. Contact the team to discuss a pilot, report a problem or propose an improvement.
Public document revision: 9fe7ccbb4e1f